Powered by Top Rated Local®

Dripper Guard Installation

Dripper Guard installs in minutes providing a stain free hull! 

*Do not apply in temperatures below 60°F

1. CLEAN AND DRY AREA surrounding and inside thru-hull removing stains and sediment build up.  Surface MUST be completely dry and above 60° before installing product.

2.  REMOVE TAPE BACKING from product.

3.  ALIGN DRIPPER GUARD with center of thru-hull.

4.  PLACE DRIPPER GUARD on surface and press firmly.  Allow a minimum of 1 hour for bonding.  Completely cured in 48 hours.

 

 

Net Orders Checkout

Item Price Qty Total
Subtotal $0.00
Shipping
Total

Shipping Address

Shipping Methods